Topside, the crew hauled away on the block and tackle to pull the skid up onto the deck.

 

Moving the skid topside required as many hands as possible to haul on the block and tackle. Once the skid was on deck, it was strapped to a small dolly, and wheeled around the sail and aft to the ATR loading hatch.

 

Back aft, Bob Gawe and Bill Derouin head up the rigging crew topside as Gil, Guns and Mike wait in the ATR for the skid to start down.

 