MK 37 Torpedo Load
USS Torsk SS-423
June 15, 2002
The skid is almost to the deck level.
After the skid had reached the deck level guide rails, it was pushed over to the port side, under the MK 14, to make space for the topside skid to come back into the room.
The crane is lowering the topside skid back into the room. This skid was placed in the lower flats, below the walking deck, so that it would be available for any future loads.