Torsk Work Weekend 19

 October 5-7, 2012

Dave Thames and Rob Howard checking tank levels on the starboard side.

 

 

The Torsk Bandit flag flying proudly as it has at every work weekend!

 

 

The growler and sound powered phone installed in the After Battery Well workshop.

 

 

Dave in the safety harness, preparing to go on the port side tank tops, as Bruce looks on.

 

 

Butch rigging lines to the bridge hatch.

The bolts holding the main spring sheared off last year, and in order to repair it,

the hatch must be moved away from the Conning Tower trunk to get access to the spring mount.

 

 

Using a chain fall to slide the hatch away from the trunk. The hatch weighs several hundred pounds!

 