Torsk Work Weekend 6

October 20-22, 2000

Saturday Page 6

Lengths of shore power cable line the deck aft. Bill Tyrrell, Art Mary and Al Perez removed them from below the deck topside. The cable was installed when Torsk was a reserve boat, and is no longer needed.


Bill Tyrrell carries the topside shore power connection box that was removed from the sail to the After Battery Well for storage.  


Larry and Gil enjoy the bridge, which is now accessible after the AC unit was removed.

John Kill stands beside the Target Bearing Transmitter (TBT) on the bridge.

 

 

Saturday Page 7