Torsk Work Weekend IV

 Saturday at work.

 Page 9

 

 

Greg examines Radio, where he spent a lot of his time when he served on Torsk.

Later in the evening, the Gyro installation continues.

 

John Kill prepares the Gyro for assembly in the Control Room. The main element was dropped through the forward tunnel with a block and tackle, then carried through the boat using a 2x4 and lines to lift it.

 

The Gyro is partially assembled, and the top is test fitted.

 

 Saturday at Work Page 10

or

Back to the TWW4 Index