Torsk Work Weekend IV
Saturday at work.
Page 2
Topside, work starts aft of the AER hatch on removal of the plywood and 2x4 deck. Pete and Tim brought more Pressure Treated Pine strips cut to the original specifications.
The 2x4's and plywood have been pulled up, and the new strips are going down.
Down in Sonar, John and John continue painting. Dan Dreisbach also assisted!
Back aft in the Control Room, Dave Thames, Frank Morgan and Fred Polgardy work on the electrical system.
Saturday at Work Page 3
or