Torsk Volunteers

Torpedo Load

November 10, 2000

Page 4

Torpedo on deck!

This is the first torpedo that Torsk has loaded in over 30 years!

 

  

 

As soon as the torpedo was safely on deck, lifting begins to get it lined up with the receiving skid in the FTR.

 

The crane held the skid in place during the entire load, with a block and tackle rigged to the loading tang on the sail and two snubber lines to the deck cleats to control the descent.

 

 

 

Page 5