USS Torsk SS-423
2011 Dry Docking
February 27-March 5, 2011
Chain Hoists in place to lift the shutter door into place for tube #6
Port side of bow.
Fitting where Fathometer head used to be attached.
Keel under bow aread.
Water cascading off the port bilge keel as the crew does a washdown topside.
Periscopes and Sail with the Bandit flag flying.
Access plate for one of the tanks. Some of the seam welds can be seen to the right.
Under the boat.
Looking across the dock as water drains down from above.
Nat Little and other members of the crew work on the washdown.
Next