USS Torsk SS-423
2011 Dry Docking
February 27-March 5, 2011
New steel was installed around the torpedo tubes aft.
Another shot showing where the new steel was installed.
The sonar dome drains stinky muddy goo.
Another shot of the nasty harbor mud that came out of the sonar dome.
The mud under the sonar dome.
Re-welding the patch over the Garbage Disposal Unit discharge.
Examining one of the keel blocks.
Starboard propellor after the cap and nut were removed.
Port side of stern showing the metal wastage and new steel.
Torching out the wooden keel blocks so that the concrete block could be moved for hull repairs and painting.
More work on the keel blocks.